Select Page

SMR Gearbox Set up
Satisfactory effectiveness is determined by suitable installation. lubrication and upkeep. thus it is important that the directions while in the set up and servicing leaflet. supplied with each and every gearbox. are followed thoroughly. a few of the significant elements of belt and torque-arm installation are listed below.
1. Install pulley on gearbox input shaft as close to the reducer feasible, and mount reducer on driven shaft as shut to bearing as useful. failure to carry out this can bring about extra loads in the input shaft bearings and output bearings and could cause their premature failure.
2. Install motor and wedge belt drive with the belt pull at around 90° to your center line involving driven and input shafts. this may permit tensioning of the wedge belt drive using the torque arm which should preferably be in tension. if output hub runs anti-clockwise. torque arm must be positioned the ideal.
3. lnstall torque-arm fulcrum on the rigid help to ensure that the torque-arm might be at about correct angles to your center line through the driven shaft as well as torque arm situation bolt. ensure there may be sufficient take up inside the turnbuckle for belt tension adjustment.
Retain close.
Bell drive can be positioned in any hassle-free postion. if your torque arm is to be utilized to tighten the belts, the drive really should be at about tight angle for the line involving the input and output shafts.
Bell drive may be located on the appropriate if preferred.
If output hub rotates clock-wise. place belt drive and torque arm in opposite course to that proven from the illustration.
Torque arm and belt take up.
Torque arm could be mounted for the proper if wanted.