Double Sided Timing Belt
v belts,china v-belts manufacturer,china timing belts,wrapping v belts,raw edge v belts,agricultural v belts,automtive v belt,china synchronour belts
1. The pitch&tooth type of double sided timing belt is same as synchronousbelt.
2. There are two kinds of double sidedtiming belt:
DAtype: Arrangement symmetrical ( see sectiona)
DB type: Arrangement overlapping ( see section b)
Note: we can produce symmetrical (DA) & overlapping (DB) two kinds doublesided timing belt,
forparticular specification, we can also make according to clients' drawing orsample.
pitch code | high | |
mm | in | |
D-MXL | 1.53 | 0.06 |
D-XL | 3.05 | 0.12 |
D-L | 4.58 | 0.18 |
D-H | 5.95 | 0.234 |
D-XH | 15.49 | 0.61 |
D-XXH | 22.11 | 0.87 |
D-T2.5 | 2 | 0.08 |
D-T5 | 3.40 | 0.134 |
D-T10 | 7.0 | 0.275 |
D-T20 | 13.0 | 0.512 |
HTD.DA-8M | 8.17 | 0 |
Noticeof keeping and installing.
1.Don't crimp when carrying, otherwise the tension element will buckle allowed minbend
diameter.(See table1)
2.Don't put belt long in abnormal state. ( See table1)
3.Please put the belt in dry place and avoid the scorching of thesun.
4.Please shorten central distance and loosen tension pulley when installing. Don'tforce the beltin.
5.Teeth with wheel should be 90?angle to belt runningdirection.
6. The parallel rate of driving gear and passive gear should be about tangent =1/1000.
Inaccurateness will influence its life ofuse.
7. Ifbelt of driving gear deviates, please adjust it and wheel'spressure.
8. With it drives, central distance changes and belt loosen. Please checkwhether belt loosen or not and
adjustthe axle.
9. Timing belt should be installed as different type and width ofbelt.
10.Tensionpulley should be installed on side of transmission belt.
type | pitch type | D(mm) | |
T type synchronous belt | MXL,T2.5 | 15 | |
XL,T5 | 15 | ||
AT5,L,T10 | 20 | ||
AT10,H | 40 | ||
XH,T20 | 70 | ||
XXH,20M | 100 | ||
Arc tooth synchronous beltf | S2M,S3M,3M,RP2M,RP3M | 15 | |
S4.5M,S5M,5M,RP5M | 25 | ||
S8M,8M,RP8M | 40 | ||
S14M,14M,RP14M | 80 |
Materials Available
1. Stainless Steel: SS201, SS303, SS304, SS316, SS416, SS420
2. Steel:C45(K1045), C46(K1046),C20
3. Brass:C36000 ( C26800), C37700 ( HPb59), C38500( HPb58), C27200(CuZn37), C28000(CuZn40)
4. Bronze: C51000, C52100, C54400, etc
5. Iron: 1213, 12L14,1215
6. Aluminum: Al6061, Al6063
7.OEM according to your request
Surface Treatment
Annealing, natural canonization, heat treatment, polishing, nickel plating, chrome plating, zinc plating,yellow passivization, gold passivization, satin, Black surface painted etc.
Processing Method
CNC machining, punch,turning, milling, drilling, grinding, broaching, welding and assembly
QC & Certificate
Technicians self-check in production,final-check before package by professional Quality inspector
ISO9001:2008 , ISO14001:2001,ISO/TS 16949:2009
Package & Lead Time
Size: Drawings
Wooden Case/Container and pallet, or as per customized specifications.
15-25days samples. 30-45days offcial order
Port: Shanghai/Ningbo port
FAQ
Q: Are you trading company or manufacturer ?
A: Our group consists in 3 factories and 2 abroad sales corporations.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: How long is your delivery time ? What is your terms of payment ?
A: Generally it is 40-45 days. The time may vary depending on the product and the level of customization. For standard products, the payment is: 30% T/T in advance ,balance before shipment.
Q: What is the exact MOQ or price for your product ?
A: As an OEM company, we can provide and adapt our products to a wide range of needs.Thus, MOQ and price may greatly vary with size, material and further specifications; For instance, costly products or standard products will usually have a lower MOQ. Please contact us with all relevant details to get the most accurate quotation.